Ipreo

Ipreo

Take a look through Ipreo's exciting new project based in London!

Before The Works Begin

The space before space are in!

Before the Works Begin

The space before space are in!

Shower

The showers before Space are in.

Before the Works Begin

The space before Space go in!

Demolition

The demolition has begun!

Stripped Out

All the space is now stripped out and ready to go!

Washrooms

Washrooms have been stripped out.

Demolition

Space are now ready to get stuck in!

Demolition

Ceilings are stripped back and exposed.

Work is underway

Work is well underway on site!

Partitions

Partitions are up!

Partitions

The partitions are going up!

Site Set Up

Safe site!

Toilets

Toilets have been stripped out!

Wires!

A few wires...

Flooring

Flooring is down!

Tidy Site

Site is looking good and progressing nicely!

Door Frames

Door frames are in!

Doors

Doors have been installed!

Carpet

Carpet is going down!

Floor Boxes

Floor boxes are ready!

Carpet

Carpet is going down!

Toilets

IPS Panels for the toilets.

Toilets

IPS Panels for the toilets are in!

Screens

Screens, monitor arms and desks have been installed.

Comms Cabinet

Comms cabinet looking great!

Base Unit

Base units for the tpoint.

Base Units

Base units for the teapoint have been installed.

Base Units

Base units have been installed for the teapoints.

Base Units

Base units have been protected!

Comms Room

Comms room is looking tidy!

Comms Room

looking good!

Faux Bricks

Faux bricks have arrived!

Ceiling

Ceiling panels over the teapoint are being installed.

Office Space

Site is coming together nicely!

Spray

The ceiling is being sprayed!

T&J

Taping and Jointing is under way.

Decorations

First coat of the decorations are complete.

-Bespoke Desk

Desk has been assembled!

Bespoke Desk

Desk is assembled!

Bespoke Desk

Bespoke shelving unit is coming together nicely!

Bespoke Desk

Bespoke desk is beginning to take shape!

Bespoke Desk

This desk will be positioned in the reception area.

Bespoke Desk

Inside of the bespoke reception desk.

Flooring

The flooring is being laid!

Flooring

Flooring is being laid!

Feature Lighting

Feature lighting has been installed.

Feature Lighting

Feature lighting has been installed.

Pendant Lights

Pendant lights have been installed. This looks great against the brick work!

Down Lights

Down lights have been installed in Ipreo!

Glazing

Manifestation has been put onto the glazing for the meeting rooms!

Flooring

The flooring in the tea-point is down!

Flooring

Flooring is being laid throughout.

Frame

The frame has been installed ready for the bookshelf and the crittal glass.

Glazing

The glazing has been installed for the meeting rooms!

Reception

Reception area is coming together nicely!

Storewall

Storewall has been installed!

Brickwork

The brick work is looking fab!

Lighting

Blacked out ceiling and lighting!

Finishing Up

Final touches are going in!

Finishing

Reception area is looking VERY smart!

Finishing

Feature lights are in!

Finishing

Love the flooring!

Finishing

Shame the beer fridge is empty 😉

Tea Point

The Tea Point is now complete!

Finishing

The job is coming to a close now, looking fab!

Ceiling

The black-sprayed ceiling looks phenomenal!

Open Plan

Open plan space.

Bathroom

Bathrooms are complete.

Reception Area

Love the brickwork!

Waiting Area

Reception Waiting Area

Black

Who knew black could look so effective?

Office

Looking good!