Prospect Business Centres – Old Bailey

Old Bailey - London

Their centres are situated in prime business locations and they ensure their centre teams are trained to ensure they offer the best quality of service possible. This is our second project for Prospect Business Centres. Take a look through our timeline to see how the project is progressing.

Before the works...

The space before the work begins.

Before the works...

The space before the work begins.

Carpet demo

The carpet tiles are being ripped up.

Carpet demo

Carpet tiles are being ripped up.

Partitions

Partitions are being installed.

Partitions

Partitions are being erect.

Partitions

Partitions creating a corridor.

Plasterboard

Plasterboard is being put up.

Plasterboard

The plasterboard is up.

Plasterboard

The plasterboard in up.

Running data cable

A run of raised access flooring has been temporarily removed so we can run the data cable underneath.

Data cables

The data cables are pulled directly from the boxes, down under the floor void.

Site Office

Plasterboard walls are built for the site office, now ready to be taped and jointed.

Curved partitioning

Partiontions have been built to create a curved walk way

Partitions

More partitions going up.

Tape and jointing

Some of the walls have been taped and jointed.

Floor boxes

The holes have been cut into the raised access floor - ready to house the floor boxes. These are being stored out of the way to avoid anyone tripping on them.

Plaster board

Plaster board ready for taping and jointing.

Curved partition

The curved partition is starting to take shape. The metal frame has been built ready to be boarded.

Curved wall

The curved wall has been boarded ready for taping and jointing, and it looks great!

Taping and jointing

The curved wall has been taped and jointed ready for decorations.

Taping and jointing

All walls have been taped and jointed, ready for decorations.

Taping and jointing

Taping and jointing ready for decoration.

Tidy site

Tidy site, easy life...

Teapoint

The first units of the teapoint have been installed - almost time to put the kettle on 😉

Door frames

The wooden frames are in place, ready for the doors to be installed.

Tea Point

The tea point is being installed.

Tea Point

The tea point is being installed.

Corridor

Corridor shot with new door frames being installed.

Tea Point

Cabinets are in for the tea point! almost time to put the kettle on...

Tea Point

Tea point cabinets are installed!

Tea Point

Tea point cabinets are installed as well as the microwave.

Doors

The door has been installed

Tea Point

The tea point has been fully installed and is now ready for the splash back to be installed.

Splashback

The blue splashback has been installed.

Flooring

T Point flooring has been installed.

Corridor

The carpets, frames and doors have been installed. The decoration is also complete!

Finishes Touches

The site is being cleaned and the finishing touches are being applied, ready for handover.

Tea Point

The tea point is now complete.

Lift trims

Lift trims have been stained walnut.

Pendant lighting

Pendant lights have been installed.

Steps

New steps installed to make it easy to carry your drink onto the roof terrace 😉

External door

The external door has been installed + the brickwork opening made good.

Plumbing

All plumbing for the boiling water tap completed ready for the first cup of tea!

Tea Point

The second tea point now completed ready for use.

Curved wall

Look at the sexy curves on that!

Breakout

The new breakout furniture has arrived!

Office desking

All framework + tops have been carried upstairs to the second floor ready to be built.

Office desking

Framework being put together.

Office desking

Furniture install now complete - let's get on with some work!