Top Secret London Project

Top Secret Client

Take a look through our North London client's exciting new project!

CAT A

CAT A works are finishing up, ready for Space to start.

Power & Data

Containment in ceiling for power and data.

Chasing Out

Chasing out works are ongoing for floor containment.

Access Control

First fix access control

Tea Point

The first fix plumbing for the tea point.

Partitions

The metal studs for the partitions are erect!

Comms Room

The comms room partition is erect.

Partitions

Insulation and ply installed to partitions.

Flooring

The floor is being prepared for the tea point.

Power & Data

Power & Data are being installed.

Tea Point

The shape of the tea point is in place, as well as the power ready for the full install!

Concrete

Laying concrete base to level out trunking.

Sockets

Sockets are being installed.

Skirting

Skirting trunking installed.

T&J

Taping & Jointing is underway.

Tea Point

Tea point is being installed.

T&J

Tape & Jointing is underway in the recessed wall for the TV

Wall Track

Folding wall track installed.

Wall Coverings

Brick wall coverings are up!

Door Frame

The door frame is being installed.