Top Secret Project

Top Secret Project

Space are completing an exciting new project in Maidenhead... Watch this space!

Before the works begin...

A lovely empty CAT A space, ready for the works to begin!

Before the works begin...

The space before we begin our project, site set up has begun!

Before the works begin...

The space before the works begin...

Before the works begin...

A view from the front.

Partitions

Partitions are going up!

Site Set Up

Site office is up and ready for business.

Site View

Site is starting to take shape, slowly but surely!

Floorbox

The holes have been cut into the floor tiles. These are then kept segregated from the rest of the site for H&S!

Front of Site

A view of the front of site is coming along nicely!

Tpoint

First fix electrical in the teapoint is in!

Ceiling Tiles

Ceiling tiles are stacked neatly out of the way whilst works are going on within the ceiling.

Walkway

A tidy walkway through site!

Offices

Offices and rooms are beginning to take shape as the plasterboard goes up!

Tidy Site

A tidy site is a happy site 😀

Walls

The space is beginning to take shape.

AC

AC is going in!

T&J

Taping & Jointing is underway!

T&J

Taping and Jointing is underway!

T&J

Taping & Jointing is underway!

Starting

Walls are up. Taped and jointed. AC is going up.

Plumbing

First fix plumbing.

Shower

Shower is being installed.

Shaped

Site is beginning to take shape.

Decorations ready

Ready for the decorations.

Decorations ready

Ready for the decorations.

Decorations ready

Ready for decorations.

Decorations ready

Ready for the decorations.

Comms room

Comms room.

Plaster Board Joints

Plaster board joints have been plastered over, electricians have cut recessed down lights out and fitting off ready to install once painted.

CEO’s office

This is where CEO’s office is located.

CEO's Office

View from CEO’s office looking towards main entrance (right) .

Kitchen Coming Together

Kitchen cabinets and island have been installed, just waiting on cabinet doors and bench top then tiling.

Fetcher wall.

View of hall way from main entrance (left) and at the fetcher wall.

Meeting Rooms

Glass trim and door frames in meeting rooms.

Meeting Room

Glass trims and door frames in meeting rooms.

Door Frames

Left hand corridor with glass trims and door frames in meeting rooms.

Glass Trims

Glass trims and door frames in meeting rooms

Plastered

Client lounge all plastered ready for undercoat of paint.

Client Lounge

Client lounge and entrance all plastered ready for undercoat.

Lights

Double recessed down light plastered into place.

Bathroom Tiled

CEO’s bathroom tiled with door frames installed.

Walk In Shower Tiled

CEO’s walk in shower tiled ready for grouting.

Grouting

Bathroom/shower wall ready for grouting.

Door Frames

Door frames in ready for glazing tracks to be installed.

Installment

Post room bench top and cabinets installed just waiting for over head shelves to arrive.

Yoga Rooms

First coat of paint on exterior yoga rooms wall.

Glazing Tracks

Right hand hallway with installed door frames and glazing tracks.

Painted

Full length view of right hand hallway with yoga rooms walls painted.

Server Room

Server room, leak detection panel and sub board installed.

Workstations

Open plan workstations in the centre of the office space.

Store Area

Hallway view into print/store area.

Breakout/Work Lounge

Breakout/Work lounge with second to last coat of paint applied.

Open Plan Workstations

Print/store room entrance and open plan workstations area.

Rooms Coming Together

View from boardroom looking at the kitchen doors and executives bathroom door.

CEO’s Office

View from Executives bathroom out into business lounge and CEO’s office.

Feature Wall

Branding feature wall in business lounge.

Business Lounge

Business lounge and CEO’s office space.

CEO's Office Space

CEO’s office space ready for flooring and glass.

View Of Business Lounge

Business lounge view towards kitchen area.

Business Lounge

Business lounge view towards entrance.

Starting Point

Bespoke joinery being created.

Creation

Bespoke joinery being created.

Creation

Bespoke joinery being created.

Development

Bespoke joinery being created.

CEO's Office

View from main entrance into CEO’s office with glazing track in and glass going in.

Glass Installment

View from inside CEO’s office out to main entrance, with glass being installed.

Toilet Sink Installment

CEO’s toilet sinks installed, looking smart with beautiful black tap wear.

Tea Point

Tea point doors waiting on glass panels and feature wall (blue).

View Of Tea Point

View from entrance through to tea point and hallway.

Bench Seat

View from bench seat inside tea point.

Acoustic Glass

Hallway through to entrance with first panels of acoustic glass in.

Office With Acoustic Glass

Hallway offices with first panels of acoustic glass.

Storewall Units

Store wall units installed in center of office space.

Installment

Store wall unit installed, ceiling tiles replaced and lighting completed.

Glass Panels

Reception and tea point view with glass panels installed.

Glazing Tracks

View from the entrance looking into the tea point room with glazing tracks and glass installed.

Feature Wall

Picture feature wall with track lighting and half of the joinery wall installed.

Post Room

Post room and CEO’s bathroom entrance.

Feature Globe

Feature globe and joinery installed in the front entrance.

Joinery Installed

Feature globe and joinery installed in the front entrance.

Main Boardroom View

View from outside the main boardroom looking down the hallway towards the rear exit.

Hallway

Other side View from outside the main boardroom looking down the hallway towards the rear exit.

Storewalls Units

Storewall units installed in open plan workstation area.

Yoga Room

Hallway view into the yoga room with flooring and glass installed.

Smoked Glass Installed

Double glazing with smoked glass installed in the sublet office at the end of the hallway.

Final Coat

Print and store area ready for final coat of paint.

Phone Booth

Double glazed and smoked glass in the phone booth.

Doors

Doors into the storage room and archive room.

Work Lounge

View of work lounge towards phone booth.

Open Plan

Very spacious area.

Main Entrance

Hallway view towards main entrance.

Symmetrical Layout

Symmetrical layout of the ceiling acoustic panels.

Open Plan Area

Completed open plan area.

Credenza

Bespoke credenza is built

Open Plan Office

A great view of an open plan office.

Storage

Storage cupboards in office.

Corridor

Spacious corridor with lovely carpet

Gallery Wall

Client artworks installed to gallery wall.

Installment

Billi Tap installed as well as copper sink and tap.

Shower Room

Shower room coming together, looking great.

T point

T point area almost finished

Feature Glass

Champagne feature glass pendants added above breakfast bar.

Feature Glass

Champagne feature glass pendants added above breakfast bar.

Finishing Details

Finishing details in the T point.

Wellness Room

Lovely flooring and spacious area

Meeting Room

Meeting Room ready to be used

Board Room

Board room all completed, looking very nice.

Front Of House

Completed front of house.

New Office

Lovely new office, with a great view.

Main Corridor

Spacious corridor with lovely lights.

Office Space

Office looking great, ready to be used.

Storage

Work walls with integrated storage installed to managers offices.

Office Space

Great office storage provided here.

Sitting Room

Completed front of house

Comfy Sitting Area

Lovely orange comfy sitting area.

Client Lounge

Feature chairs added to client lounge.

Boardroom Gallery

Boardroom gallery completed with feature paneling.

Completed

Sitting area looking very nice.