Peter Brett Bristol

07MAY
PBA Bristol
This is another new exciting project for Peter Brett Associates based in Bristol! take a look through the timeline and see how the project is coming along...




09MAY
Welfare Area
The temporary welfare area is set up to keep the workers happy with their free tea.







13MAY
Partitions
The mid height partition is built next to the tea-point to create the far meeting room.

16MAY
Half Height Entrance
The half height entrance wall is built and first layers of board are fixed.


16MAY
Ceiling
The new ceiling grid for the moisture resistant shower and drying area ceiling is installed.








20MAY
Open Plan
A look back down the open plan area. The timber capping is fitted to the half height wall.

21MAY
Tea Point
The base units and worktops are fitted for the tea point area and reprographics area.

21MAY
Reprographics Area
The base units and worktops are fitted for the tea-point area and reprographics area.

21MAY
Tea Point
The base units and worktops are fitted for the tea-point area and reprographics area.
















03JUN
Meeting Room
The glass is installed to the meeting room wall looking through to the tea-point.



06JUN
Manifestation
Manifestation etch is applied to the glass between the meeting room and tea-point.