Dyer & Butler Phase 2

Dyer & Butler

This is the second phase that we have done for Dyer & Butler. Please take a look through the timeline to see how their exciting new project is coming along.

Site Set Up

The site set up has all of the protection laid.

Site Set Up

Site set up has all of the protection laid.

Site Set Up

Site set up, protection is laid.

Materials

Materials lay down area.

Welfare Area

The welfare area is all set up!

Site Set Up

Direction signage and site protection.

Site Set Up

Site protection is set up and laid.

Site Set Up

Stairwell is being protected.

Exit

Corex and signage in the emergency exit.

Skip Area

The skip area is ready for the skip!

Plumbing & Electrics

Plumbing & Electrics isolated, cubicles and sanitary ware has also been ripped out.

Toilets

Sanitary ware and cubicles removed

Toilets

sanitary ware and cubicles removed.

Toilets

Sanitary ware removed.

Toilets

Sanitary ware removed.

Electrics

Electrics have been isolated.

Ceiling

Asbestos removed from FF ceiling.

Flooring

Vinyl flooring removed.

Stripping

Stripping out complete and first fix electrical is complete.

Ceiling

The ceiling grids are being installed.

Heater

Water heater boxing installed.

Lighting

First fix lights have been installed.

Gents

Cisterns have been installed.

Urinals

Urinals cistern has been installed.

Ladies

Ladies FF boxing and cistern installed.

Ladies

Ladies cistern installed.

Ceilings

Plasterboard has been placed on the ceilings.

T&J

Taping and jointing completing.

Decoration

First coat of pain the corridor.

Decoration

First coat of paint in the ladies.

Decoration

First coat of paint in the gents.

Flooring

Sub floor prep complete.

Flooring

Vinyl flooring is complete.

Ceiling

Ceiling and boxing-inn installed to ground floor toilet lobby.

Stairwell

Stairwell has been re-decorated.

Stairwell

Stairwell freshened up with new ceiling tiles.

Ladies

Lights & PIR fitting in FF ladies.

Gents

Lights installed above cubicle in FF gent's.

Water Heater

Access panel installed to boxing-inn covering the water heater.

Partition

New partition installed in FF office and decorated.

Partitions

Other side of new partition installed in FF office and decorated.

Staircase

Staircase and skirting has been re-decorated.

Ladies

Lights & PIR installed in GF ladies toilets.

Lighting

First coat of decorations and holes cut in preparation for lighting installed.

Plumbing

Second fix plumbing complete on both FF and GF toilets, with complete installation of toilets.

Plumbing

Second fix plumbing complete on all vanity units and installations of basins, all tiling completed.

Accessories

Hand dryers have been installed.

Accessories

All basins, tiling, hand dryers installed along with second fix plumbing.

Urinals

Urinals have been installed.

Urinals

Second fix plumbing for urinals are complete.

Gents

Gents vanity unit is installed and complete, plus privacy screen has been installed.

Staircase

New carpet has been installed to staircase.

Carpet

First floor landing has been carpeted.

Staircase

New nosings have been installed.

Toilet

The toilets have been installed and are ready to go!

Flooring

Flooring is complete!

Finishing Touches

Final touches in the bathroom!

Sinks

The units, basins and mirrors have all been installed. Along with the finishing touches such as hand dryers, bins and soap.

Desk

Desks, screens, peds and chairs are in! The screens match Dyer & Butler's colours!

Storewall

Storewall is installed, a great way of saving space and have massive amounts of storage!

Open Plan

Desks, chairs, peds and storewalls are installed.

Urinals

Urinals have been installed in the gents.

Privacy Panels

Privacy panels have been put in place beside the urinals.