Moneybarn

Ground Floor

Existing Ground Floor

Ground Floor

Existing ground floor walls.

Ground Floor

Existing ground floor.

Ground Floor

Existing ground floor before works begin.

Existing Ground Floor

Different angles of the ground floor before works.

Existing Ground Floor

Different angles of the ground floor before works.

Existing First Floor

Before the works commence on the first floor.

Existing Ground Floor

Window view on first floor.

First Floor

Existing first floor.

First Floor

Existing offices on the first floor.

Front Entrance

Front entrance to the building which will become the back entrance.

Site Set Up

Site set up being delivered.

Site Set Up

Site set up, ready for works to begin.

Site Set Up

Site set up, ready for it to begin.

First Floor

First floor being stripped out

Strip Out

First floor strip out.

First Floor

Strip out being completed on first floor ready for works.

Strip Out

First Floor being completely stripped out.

Wire Strip Out

Wires in the ceiling are being stripped out.

Outside Works

Works commencing outside.

Metal Strip Out

Metal completely stripped from ceilings.

Scaffolding

Scaffolding being evicted.

Scaffolding

Scaffolding being evicted

Digger

Delivery of plant hire.

Installment Of Netting

Demo installed safety netting.

Installment Of Netting

Demo installed safety netting.

Safety Netting

Safety netting installed.

Roof Materials

Arrival of roofing materials

Roofing Materials

Roofing materials being lifted into place

Roofing Materials

Roofing materials being lifted into place.

Roof Panels

Roof panels being removed

Roof Panels

Roof panels being removed.

Installment

Roof materials being installed

External Decorations

External decorations have started.

Window Films

Ground floor window films are removed to allow more natural light in.

Safety Netting

Safety netting removed from first floor

Netting

Netting removed from the back of the 1st

Ceiling Cleared

Ceiling cleared at back of ground floor.

Ceiling Cleared

Ceiling cleared at back of ground floor.

Ceiling Cleared

Ceiling cleared at back of ground floor.

Snagging

First floor ceiling snagging begins.

Demo

Second half of ground floor prepped for demo

Ground Floor

Ground floor central wall begins to be removed.

Ground Floor

Ground floor half cleared.

Gutters

Re-lining the existing gutters.

Roofing Panels

Roofing panels fully fitted including the hips.

Old Vaults Cleared

Old vaults cleared of lights and containment.

Old Toilets

Tiles removed from walls in old toilets.

Snagging

Snagging begins on ground floor.

Roof Removed

Old entrance porch glass and roof removed.

Lift Shaft - First Floor

Lift shaft removed on 1st and ground floor.

Demolition

Demolition nearly completed

Demolition

Demolition nearly completed

Demolition

Demolition nearly completed

Demolition

Demolition nearly completed

Demolition

Demolition nearly completed

Demolition

Demolition nearly completed

New Drainage Runs

Concrete cut out to install new drainage runs.

Drainage Works

Drainage works Continue.

Drainage Works

Drainage works Continue.

Insulation Works

Insulation works to stop the cold bridging.

1st Floor

Insulation to stop cold bridging nearly completed on 1st floor.

New Drainage

New drainage pipes begin to be installed.

New Drainage

New drainage pipes begin to be installed.

New Doorways

New doorways and lintels installed.

Removed Front Porch

Front porch fully removed.

Drainage Runs Installed

New drainage runs installed in.

Drainage Runs Installed

New drainage runs installed in.

Door Openings

All door opening lintels have been put in place.

Rubble Removed

More rubble removed from the first floor openings

Drainage

Drainage is completely back filled and prepped for concrete.

Containment Opening

Containment opening made in wall for services to pass.

Plasterboard

Fixings for plaster board are screwed in ready for lining out

Ground Floor Columns

Ground floor columns are fire lined.

First Floor

More containment and ducting installed on the first floor

Final Doorway

Final doorway is infilled to create the new layout.

Drainage

Drainage is all completely backfilled and prepped for concrete

Windows

Window openings.

Ductwork

Duckwork first fix.

Ductwork

Ductwork first fix

Windows

Internal window openings

Internal Windows

Internal window openings

Raised Access Flooring

Raised Access flooring being fitted

Raised Access Flooring

Raised access flooring being fitted.

Raised Access Flooring

Raised access flooring being fitted.

Flooring Upstairs

A quarter of the floor is placed upstairs.

AC - Ground Floor

AC duct on the ground floor is nearly fully lagged.

Floor Tiles

Floor tiles are ready to be placed on the first floor.

Plumbing Installation

Plumbing installation in ground floor toilets.

Scaffolding Removed

Outside of the building with the scaffolding removed.

Main Boardroom

Main boardroom are fully built and taped and jointed.

Ceiling Grid

Ceiling grid begins to be installed on first floor.

Taped And Jointed

Walls for the training room and comms room are built and taped and jointed.

Ceiling Grid

More ceiling grid installed on the first floor.

Steel Works

Steel work in the new reception area installed for the new stairs and mezzanine.

Steel Work

Steel work in the new reception area installed for the new stairs and mezzanine.

Raised Access Flooring

Raised access flooring installed on ground floor.

New Front Entrance

Framing for the curtain wall system installed on the new front entrance.

Plasterboard

Plasterboard skin being applied to blockwork walls.

Reception Area

Reception area prepared for mezzanine floor install

Fire Curtain

Fire curtain begins to be installed.

Stage 1 Completion

First floor ceiling grid approaching stage 1 completion.

First Floor Jointing

Jointing coming along nicely on first floor and corner beads installed.

New Reception Area

New reception area before mezzanine floor.

New Wall Openings

New wall openings to canteen area.

Canteen

New canteen walls , first fix.

Fan Coil

Fan coil being installed.

Tape And Jointing

Tape an jointing has started.

Ready For Boarding

Corridor walls sealed and ready fore boarding.

Training Rooms

Ceiling grid being installed in training rooms.

Boardroom And Meeting Room

Boardroom and meeting room walls being erected.

Mechanical Install

Boardroom walls and mechanical install.

Front Curtain Wall

Front curtain wall being exposed.

Mezzanine Steels

Mezzanine steels arriving.

Mezzanine Steels

Mezzanine steels being installed.

Mezzanine Steels

Mezzanine steels being installed.

Windows

External windows being installed.

New Front

Opening made in new front of building for window.h

Ductwork

Ductwork on 1st floor ready for grills.

Training Room

Training room fully lined out and taped and jointed.

Data

Data cable runs being installed.

Jointing & Lining

Jointing and lining completed to exterior of comms room and training room.

Front Ramp

Excavations for front ramp underway

First Floor Office

First floor offices being built.

Awaiting Glass Install

Ground floor window openings awaiting glass install.

Feature Ceiling Built

First floor offices feature ceiling built.

Training Room

Training room internals.

Plaster

Plaster applied to base build walls.

AC Condensers

Plinth made for AC condensers.

Fire Curtain Install

Fire curtain installed for first floor offices.

Pipes Installed

Pipes installed in first floor toilets.

Feature Ceiling

Feature ceiling on the first floor is taped and jointed.

Feature Ceiling

Feature ceiling on the first floor is taped and jointed.

Feature Ceiling

Feature ceiling on the first floor is taped and jointed.

Mezzanine

Wall to new mezzanine is built

Ceiling Tiles

Ceiling tiles start to go in on first floor.

New Boardroom.

Walls to the new board room are taped and jointed

New Boardroom

Walls to the new board room are taped and jointed.

Main Boardroom

MF ceiling is built in main boardroom.

Distribution Boards

New distribution boards are fitted ready to be wired.

AC Units - Ground Floor

AC units awaiting grills in ground floor.

Taped And Jointed

Tea point is taped and jointed.

Taped And Jointed

Tea point is taped and jointed.

Plumbing on Ground Floor

First fix plumbing in place on ground floor.

New Reception

New reception area begins to be lined out and mezzanine columns are fire lined.

New Reception Area

New reception area begins to be lined out and mezzanine columns are fire lined.

Mezzanine Columns

New reception area begins to be lined out and mezzanine columns are fire lined.

Feature Rafts

Feature rafts in canteen painted.

Frames Fitted

Super lube door to front entrance.

Concrete

Concrete layout by front entrance.

Concrete

Concrete poured in entrance door

Concrete

Concrete poured for entrance steps.

Revolving Door

Revolving door to front entrance.

Revolving Door

Another view of the revolving door to front entrance.

Revolving Door

Revolving door to front entrance.

Comms Room

Comms room patch panels made of.

Canteen Floor

Canteen floor preparation begins.

Raised Access Flooring

Raised access flooring installed in reception.

Reception

Raised access flooring installed in the reception.

Raised Access Flooring

Raised access flooring installed in reception.

Canteen Ceiling

Canteen ceiling being sprayed.

Canteen Ceiling

Canteen ceiling being sprayed.

Ceiling In Canteen

Canteen ceiling being sprayed.

Steeled Staircase

Reception steeled staircase installed.

Reception Area

Reception area.

Carpet Tiles

Carpet tiles being set out.

Carpet Tiles

Carpet tiles being set out.

Open Plan

Open plan carpet laid.

Feature Capet

Feature carpet laid and office doors installed.

Glass Installed

Glass being installed in meeting rooms.

Boardroom Carpet

Boardroom carpet installed.

Boardroom Carpet

Boardroom carpet installed.

Flooring

Flooring finished being laid.

Meeting Room

Meeting room carpet installed.

Meeting Room

Meeting room carpet installed.

Ground Floor - Flooring

Ground floor flooring being prepared ready for carpet.

Ceramic Tiles

Ceramic tiles being laid in reception.

Reception

Steps to reception nearly complete.

Ramp To Reception

Stairs and ramp to reception are nearly complete.

Mezzanine Flooring

New mezzanine floor being boarded.

Data Cables

Data cables being installed.

Partition In Meeting Rooms

Partition wall in mezzanine meeting room ready to be boarded.

First Floor

First Floor ceiling grid installed.

First Floor

First Floor ceiling grid installed.

Taped And Jointed

First floor central offices taped and jointed.

Tape And Jointed

First floors central offices taped and jointed.

Feature Lights

Boardroom ceiling prepped for feature lights.

Ground Floor

Ground floor central offices first coat.

Data Cables

Data cables in comms room.

New Windows

New windows installed by mezzanine.

Mezzanine Meeting Room

Mezzanine meeting room window opening ready to be taped and jointed.

Site Workers

Hard working operatives getting a well deserved treat.

Boardroom Ceiling

Boardroom ceiling completed ready for feature lighting.

Boardroom

Boardroom prepped and ready for carpet tiles and door frame.

Door Frame

Door frame installed in boardroom.

Door Frames And Tracks

Door frames and track for glass installed for MD office.

First Floor Central Offices

Door frames and track for glass wall installed in first floor central offices.

First Floor Central Offices

Door frames and track for glass wall installed in first floor central offices

First Floor Central Offices

Door frames and track for glass wall installed in first floor central offices.

Ali Door Frame

Ali door frame details on central first floor offices.

Exterior Mezzanine

Exterior of new mezzanine taped and jointed.

Feature Lighting In Lobby

Feature lighting in lobby ready for painting.

T-Point

First floor t-point completed.

Handrails

Hand rails installed on entrance ramp.

Tiled And Grouted

Island back tiled and grouted.

Installment

Desks beginning to be installed on ground floor.

Open Area

First floor open area ready for desks to be installed.

Desks Installed

Desks installed on ground floor waiting for computer screens

Privacy Panels

Privacy panels and table installed in upstairs t point

Manifestation

Manifestation applied to entrance to meeting room.

Canteen Area

New notice boards on feature wall in main canteen area

Lockers

New staff lockers.

Privacy Screens

Privacy screens in first floor tea point.

Coffee Machines

Coffee machines installed and ready for staff in main canteen area.

T-Point Ready

First floor t-point ready for staff.

Building Entrance

Building entrance cleaned ready for staff to start arriving.

Computer Screens

Computer screens starting to be installed.

First Floor Desks

First floor desks installed ready for computers

Building Entrance

Building entrance cleaned ready for staff to start arriving

GYM

Gym ready for equipment to be moved in.

Studio

Studio finished and ready for staff to start using

Unisex Superloos

Unisex superloos completed

Smoking Area

Smoking area completed with cover.

Canteen

Canteen completed and furnished.

Canteen

Canteen completed and furnished.

Canteen Completed

Canteen completed and furnished.

First Floor Office Space

Computer screens installed in first floor office space ready for staff to move in.

Walls In Lobby

Green moss and log feature walls in lobby.

Log Feature Wall

Log feature wall in lobby.

Notice Board

First floor notice board showing old photos of the building and t-point.

Ground Floor Office

Computer screens installed in ground floor office space ready for staff to move in.

Lobby Waiting Area

Chair and side table in lobby waiting area.

MD's Office

Furniture beginning to be installed in MD’s office.

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!

Handover

The new office is complete!